1. The installation of cold and hot water pipes in the bathroom generally goes on the top and not on the ground, and needs to be flat and straight during the laying process to avoid bending. The layout should be safe and reasonable, and it should be kept away from the circuit.
2. The hot and cold water pipes in the bathroom should be separated and not close. The water outlets of cold and hot water should be kept horizontal, generally hot on the left and cool on the right. The height of the shower pipe is between 1.8--2.1 meters.
3. The position of the pipe clamp and the slope of the pipe must meet the specifications. The valve should be installed in the correct position and installed flat for easy use and maintenance. The cold and hot water pipes are normally built into the wall. When grooving, the depth of the grooves should be checked in advance, and the hot and cold water pipes should not be in the same groove.
4. When installing the water inlet and outlet of the water heater, it is necessary to consider in advance that the water inlet and air inlet valves are installed in the corresponding positions.